Planning a fence installation in Roswell, Georgia? Understanding the local permit requirements is crucial for a smooth project. This comprehensive guide covers everything you need to know about Roswell's fence permit process, from application to approval.

Roswell Georgia city hall with fence permit documents

Quick Reference - Roswell Fence Permits

Permit Required: Fences over 4 feet tall
Application Fee: $50-$75
Processing Time: 5-10 business days
Setback Requirement: 5 feet from property line

When Do You Need a Fence Permit in Roswell?

Permit Required

  • • Fences over 4 feet in height
  • • Any fence in front yard area
  • • Fences near property boundaries
  • • Commercial property fencing
  • • Pool safety fencing

No Permit Needed

  • • Fences 4 feet or shorter in backyard
  • • Temporary construction fencing
  • • Garden borders under 2 feet
  • • Decorative landscape edging
  • • Existing fence repairs (same height)

Roswell-Specific Fence Requirements

Height Restrictions

  • Front Yard: Maximum 4 feet (decorative only)
  • Side Yard: Maximum 6 feet
  • Rear Yard: Maximum 8 feet
  • Corner Lots: Special visibility triangle requirements

Setback Requirements

  • Property Line: Minimum 5 feet setback
  • Easements: Must be outside all utility easements
  • Sidewalks: 3 feet minimum from public sidewalks
  • Driveways: Cannot obstruct sight lines

Material & Design Standards

  • • Chain link fences must have privacy slats in front yards
  • • Barbed wire prohibited in residential areas
  • • Electric fences require special permits
  • • Finished side must face neighboring properties

Step-by-Step Application Process

1

Prepare Required Documents

  • • Property survey or plat map
  • • Fence design plans with dimensions
  • • Material specifications
  • • Completed permit application form
2

Submit Application

Submit your application to Roswell City Hall or online through the city's permit portal. Include all required documents and pay the application fee.

3

Plan Review

City staff will review your application for compliance with zoning ordinances and building codes. This typically takes 5-10 business days.

4

Permit Approval & Issuance

Once approved, you'll receive your permit. Keep this document on-site during construction for inspection purposes.

Permit Fees and Timeline

Permit Fees (2025)

  • Residential Fence: $50
  • Commercial Fence: $75
  • Pool Safety Fence: $60
  • Re-inspection Fee: $25

Processing Timeline

  • Application Review: 5-10 business days
  • Corrections (if needed): 3-5 days
  • Final Approval: 1-2 days
  • Total Time: 7-15 business days

Common Permit Application Mistakes

Avoid These Common Errors:

  • • Not checking for underground utilities before digging
  • • Assuming property lines without a current survey
  • • Ignoring HOA requirements and approvals
  • • Installing fence before permit approval
  • • Not considering drainage and grading issues
  • • Forgetting to schedule required inspections

Roswell Permit Office Contact

Roswell City Hall

38 Hill Street
Roswell, GA 30075

Contact Information

Phone: (770) 594-6020
Hours: Mon-Fri 8:00 AM - 5:00 PM

Need Help with Your Roswell Fence Permit?

Our experienced team handles all permit applications and ensures code compliance for your Roswell fence project.

Get Professional Help Today

Related Articles